转运条款英文怎么写,装运条款翻译
The port of loading is Shanghai for the moment,the port of destination is Osaka for the moment.It can be changed with an agreement between buyer and seller.The goods will be partial shipments in three equal lots during May,June,July of 2000.。
2.合同中包装运输条款的英文翻译1,欢迎补充Packaging and transport 6.1 In order to meet the long-distance transport. Repeatedly handling storage needs, to ensure the integrity of the safety equipment to reach the contract factories, all of the packaging equipment to secure solid, according to the national packaging standards related to the implementation of standards and design requirements. 6.2 Where the goods shipped in special transport requirements (such as temperature. Impact. Dangerous goods), the seller must pay attention to a matter of description, supplier of dangerous goods according to "mark the packaging of dangerous goods GB190-85" provisions set out in its name. Nature. Security issues such as brochures, the above-mentioned statement in the 30 days prior to delivery of equipment sent to the buyer. 6.3 for the disintegration of the need for transportation equipment, for each of their cases within the device should be accompanied by the following information: the name of the main equipment., The contract. Fig,. Disintegration of the list of components (including the name of the parts. Fig,. The number of Etc.). 6.4 for a single more than 20 tons weight or appearance size (L 'wide' high) 10m'3m'3m than in any of the large goods, the seller must deliver equipment within 30 days prior to the draft plan will form the size (marked Size appearance. Weight. Hoisting focus and attention to the matter, and so on) one-two sent to the buyer. If the car for transportation is limited to high-4m. 6.5 for spare parts. Vulnerable parts replacement. Dedicated a separate tool shipped in crates. 6.6 belong to the seller of poor packaging or marking device defects caused by the unclear, the seller is responsible for repair. To replace or supplement, and to bear the direct costs. If the buyer Baoguanbushan due to defects caused by equipment, should actively cooperate with the seller, the buyer for repair. To replace or supplement a result, the cost borne by the buyer. 6.7 the seller will be responsible for the contract to install equipment to the buyer at the scene, without affecting the installation project under the premise of the seller to determine the mode of transport at the expense of the seller take care of themselves. Charge d'affaires of the rail transport equipment and insurance, such as the use of other modes of transport should be agreed in advance with the consent of the user, freight and insurance costs borne by the buyer. Checked the seller's agent who carried equipment units resulted in the loss. Damage, according to the relevant provisions of the unit carried by the seller to negotiate the two sides actively cooperate with the common claim to do a good job of work.。
3.合同中包装运输条款的英文翻译2,欢迎补充6.8 After the seller of goods transport procedures after three days of the notice by fax to the buyer, which reads: No. contract. Projects,. Name of the device. Number of boxes. Number. The total weight. Waybill number. No. wagon. (Car brand. Shipping, or Mail). Date of issue. Receipt by the buyer signed the way. 6.9 for the car, such as transport, the above-mentioned information. Formalities, a transportation in the first three days of notification by fax to the buyer and the other vehicle with the cargo directly to pay the buyer. 6.10 arrival of equipment will take place at: Vehicle: Less-than-truckload: Each of the two cases on the side adjacent to use non-fading paint marking main marked as follows: Contract: Mark: (Contract No.) Receiving: Receiving units: Equipment: Me / Number: Gross weight / Net Weight (kg): Size (L 'wide' high-mm): Categories of goods: Unit shipments: Note: The bulky goods shall be noted in the center of gravity and lifting focus. 6.10.1 "mid" mechanical. Electric. Instrumentation. Precision instruments. Computer. Dangerous goods. Time-sensitive goods. Spare parts or tools. Materials. Refractories, and so that the words in the box on the surface. 6.10.2 electrical equipment, instrument panel category in the box outside marked with red paint inside the front plate disk, mark it as: "is." 6.10.3 In addition to the above tag, but also all kinds of goods should be marked with water-resistant requirements. Moisture. Anti-inverted. Inflammable. Fragile. Warning markers, such as toxic. 6.10.4 exposed parts. Tied with pieces of galvanized sheet marked with the content of 6.10, including the terms of the content. 6.11 and the box tied with pieces of parts and components in bulk, the per-item should be marked with (with or without labels fading paint to write) their host name, the name of the parts and pieces of the packing list in the serial number on the map and assembly Serial number of spare parts in addition to the above-mentioned writing, still marked "prepared". 6.12 equipment inside the box should be accompanied by the following information: A. Packing List: one-third of, content, the contract should include. Projects,. Name of the device. Specifications. Model. Number. Weight. Chart, (if the box is the disintegration of parts and components should be listed in the name of parts and components, and map ). B. product certification in triplicate (the original of which two copies). Equipment should be qualified to provide a certified copy of the original three. C. assembly equipment (including assembly plans. Installation. Maintenance of the components required for assembly. Wiring diagram. Pipeline map) in triplicate. D. vulnerable pieces of equipment, spare parts and equipment to map the list of spare parts in triplicate. E. product inspection records in triplicate. F. above shipping box with a set of data should be placed on the first of the main box and marked with "inside information here", the other two in three working days after the shipment sent to the buyer.。
4.信用证条款 43T TRANSSHIPMENT(转运条款)表示该信用证是直信用证条款 43T TRANSSHIPMENT(转运条款),后面应该有相应的描述,即:允许或不允许。
如果是允许,那么是指允许受益人订舱时,如果没有直达目的港的船,那么可以订非直达船,途中允许经某港口转船后运至目的港。
通俗地说,该条款就是允许受益人装运时,如果能够装直达船最好,如果没有直达船,可以通过转船将货物运抵目的港。
如果是不允许,则受益人只能装直达船,而不能装非直达船。
该条款即不是指信用证的到达,也不是指文档到达,更不是指货款到达。
-
创意花束男朋友特别有爱意的呢称,创意花束男朋友昵称特别
1、压寨夫君、故事贩卖机、不忍抛弃的小逗比、户口本第一页。2、快到碗里来、傲娇小公主、大长腿欧巴、肩上风尘、男神大人撒浪嘿。3、男神大人撒浪嘿、最爱我的超人、你是我宝、我的男票、只酷不说帅。4、我男人、樱桃小老头、我的眼中仅有你、最爱我男神、宇...
-
旧家具怎样变新
旧家具的更新主要有以下几种情况:①作局部的修改加工,改变其使用功能。②改换贴面材料或油饰见新。③使用各类装饰织物,掩盖不足。其中以油漆的方式更新家具,增加其美观的作法使用最多。将原有油漆从家具上清除的方法有三种。砂纸擦和热脱的方法可清除普通油漆。...
-
很装的语录
其实你我都一样,人人都在装,关键是要装像了,装圆了,有一个门槛,装成了就迈进去,成为传说中的性情中人,没装好,就卡在那里了。就是卡门。叶昊,我现在就想跟你说三个字,草泥马,如果非要加个期限的话,我希望是一万头……有很多的时候,想对自己说,不装强大会死吗?却又笑了!天上的星...
-
罪恶都市任务攻略是什么
1、主流任务(大部分任务与过关有着必然的联系,有些虽没有联系,但可以增加财产,提供免费枪支和车辆等)2、*TheParty*到换衣点换好衣服到达海边的游艇处参加晚会,驾车送Mercedes到PolePositionClub。报酬:1003、*BackAlleyBrawl*到MalibuClub找KentPaul了解情况后,到绿点...