转运条款英文怎么写,装运条款翻译
The port of loading is Shanghai for the moment,the port of destination is Osaka for the moment.It can be changed with an agreement between buyer and seller.The goods will be partial shipments in three equal lots during May,June,July of 2000.。
2.合同中包装运输条款的英文翻译1,欢迎补充Packaging and transport 6.1 In order to meet the long-distance transport. Repeatedly handling storage needs, to ensure the integrity of the safety equipment to reach the contract factories, all of the packaging equipment to secure solid, according to the national packaging standards related to the implementation of standards and design requirements. 6.2 Where the goods shipped in special transport requirements (such as temperature. Impact. Dangerous goods), the seller must pay attention to a matter of description, supplier of dangerous goods according to "mark the packaging of dangerous goods GB190-85" provisions set out in its name. Nature. Security issues such as brochures, the above-mentioned statement in the 30 days prior to delivery of equipment sent to the buyer. 6.3 for the disintegration of the need for transportation equipment, for each of their cases within the device should be accompanied by the following information: the name of the main equipment., The contract. Fig,. Disintegration of the list of components (including the name of the parts. Fig,. The number of Etc.). 6.4 for a single more than 20 tons weight or appearance size (L 'wide' high) 10m'3m'3m than in any of the large goods, the seller must deliver equipment within 30 days prior to the draft plan will form the size (marked Size appearance. Weight. Hoisting focus and attention to the matter, and so on) one-two sent to the buyer. If the car for transportation is limited to high-4m. 6.5 for spare parts. Vulnerable parts replacement. Dedicated a separate tool shipped in crates. 6.6 belong to the seller of poor packaging or marking device defects caused by the unclear, the seller is responsible for repair. To replace or supplement, and to bear the direct costs. If the buyer Baoguanbushan due to defects caused by equipment, should actively cooperate with the seller, the buyer for repair. To replace or supplement a result, the cost borne by the buyer. 6.7 the seller will be responsible for the contract to install equipment to the buyer at the scene, without affecting the installation project under the premise of the seller to determine the mode of transport at the expense of the seller take care of themselves. Charge d'affaires of the rail transport equipment and insurance, such as the use of other modes of transport should be agreed in advance with the consent of the user, freight and insurance costs borne by the buyer. Checked the seller's agent who carried equipment units resulted in the loss. Damage, according to the relevant provisions of the unit carried by the seller to negotiate the two sides actively cooperate with the common claim to do a good job of work.。
3.合同中包装运输条款的英文翻译2,欢迎补充6.8 After the seller of goods transport procedures after three days of the notice by fax to the buyer, which reads: No. contract. Projects,. Name of the device. Number of boxes. Number. The total weight. Waybill number. No. wagon. (Car brand. Shipping, or Mail). Date of issue. Receipt by the buyer signed the way. 6.9 for the car, such as transport, the above-mentioned information. Formalities, a transportation in the first three days of notification by fax to the buyer and the other vehicle with the cargo directly to pay the buyer. 6.10 arrival of equipment will take place at: Vehicle: Less-than-truckload: Each of the two cases on the side adjacent to use non-fading paint marking main marked as follows: Contract: Mark: (Contract No.) Receiving: Receiving units: Equipment: Me / Number: Gross weight / Net Weight (kg): Size (L 'wide' high-mm): Categories of goods: Unit shipments: Note: The bulky goods shall be noted in the center of gravity and lifting focus. 6.10.1 "mid" mechanical. Electric. Instrumentation. Precision instruments. Computer. Dangerous goods. Time-sensitive goods. Spare parts or tools. Materials. Refractories, and so that the words in the box on the surface. 6.10.2 electrical equipment, instrument panel category in the box outside marked with red paint inside the front plate disk, mark it as: "is." 6.10.3 In addition to the above tag, but also all kinds of goods should be marked with water-resistant requirements. Moisture. Anti-inverted. Inflammable. Fragile. Warning markers, such as toxic. 6.10.4 exposed parts. Tied with pieces of galvanized sheet marked with the content of 6.10, including the terms of the content. 6.11 and the box tied with pieces of parts and components in bulk, the per-item should be marked with (with or without labels fading paint to write) their host name, the name of the parts and pieces of the packing list in the serial number on the map and assembly Serial number of spare parts in addition to the above-mentioned writing, still marked "prepared". 6.12 equipment inside the box should be accompanied by the following information: A. Packing List: one-third of, content, the contract should include. Projects,. Name of the device. Specifications. Model. Number. Weight. Chart, (if the box is the disintegration of parts and components should be listed in the name of parts and components, and map ). B. product certification in triplicate (the original of which two copies). Equipment should be qualified to provide a certified copy of the original three. C. assembly equipment (including assembly plans. Installation. Maintenance of the components required for assembly. Wiring diagram. Pipeline map) in triplicate. D. vulnerable pieces of equipment, spare parts and equipment to map the list of spare parts in triplicate. E. product inspection records in triplicate. F. above shipping box with a set of data should be placed on the first of the main box and marked with "inside information here", the other two in three working days after the shipment sent to the buyer.。
4.信用证条款 43T TRANSSHIPMENT(转运条款)表示该信用证是直信用证条款 43T TRANSSHIPMENT(转运条款),后面应该有相应的描述,即:允许或不允许。
如果是允许,那么是指允许受益人订舱时,如果没有直达目的港的船,那么可以订非直达船,途中允许经某港口转船后运至目的港。
通俗地说,该条款就是允许受益人装运时,如果能够装直达船最好,如果没有直达船,可以通过转船将货物运抵目的港。
如果是不允许,则受益人只能装直达船,而不能装非直达船。
该条款即不是指信用证的到达,也不是指文档到达,更不是指货款到达。
-
婚前买房和婚后买房哪个好
婚前买房和婚后买房有区别,前者属于个人财产,后者属于夫妻共同财产。婚后买房更好,但父母出资除外。婚前买房归购买者所有,婚后买房需共同财产公证。若男方婚前买房,离婚时归男方所有,除非公证为共同财产。婚后买房男方出资,需夫妻共同签字。无论先后买房,两人幸福不变...
-
烟雨江湖地图盘点
1、烟雨江湖的地图有。南阳渡太乙山洛阳落霞镇华山嵩山姑苏等等地图。2、烟雨江湖是一款2D角色扮演类游戏。在游戏中玩家需要扮演一位初入江湖的侠士,在一个真实开放且多变的江湖中探索,面对上百种玩法与数之不尽的要素时做出自己的选择,走出一条只属于自己的道路...
-
2023婚后用彩礼钱买的房算是夫妻共同财产吗
法律分析:是。婚后用彩礼购买的房产,登记在女方一人名下,属于夫妻共同财产。登记在夫妻双方名下,属于夫妻共同财产。法律依据:《中华人民共和国民法典》第一千零六十二条夫妻在婚姻关系存续期间所得的下列财产,为夫妻的共同财产,归夫妻共同所有:(一)工资、奖金、劳务报...
-
抵押借款合同需要具备哪些条款
一、抵押借款合同需要具备哪些条款1992年12月31日司法部发布、施行的《抵押贷款合同公证程序细则》规定:抵押贷款合同应具备下列条款:(一)借款人、贷款人名称、地址、法定代表人或代理人的姓名、借款人的开户银行及帐号、合同签订日期、地点、合同生效日期;(二)贷款的...